Addition/Renovation of Shop Building, Terlingua Maintenance Facility
Completion: 2010
Owner: Texas Department of Transportation
Contact: Carlos Mendoza (432)371-2280
Architect/Engineer: Morales & Associates, Architects, Inc.
Subcontract Amount/Description: $215,000.00 /Renovation of the existing shop building converting it
into an administrative space and the construction of a new shop/maintenance building and
miscellaneous site improvements.
Concrete Slab at Pole Barn, Presidio, TX
Projected Completion: Nov, 2011
Owner: Big Bend State Park
General Contractor: WestMix
Contact: Robert Meredith, (432) 295-2666
Amount/Description: $17,100.00 / Construction of 5,500-sf concrete slab with 3000-psi concrete
reinforced with #4 rebar and installation of 12-in PVC storm drain pipe and concrete inlet.
LCOGT Telescope Concrete Pads, McDonald Observatory
Concrete Subcontract; Construction of four telescope concrete pads and miscellaneous concrete
structures to house the LCOGT Domes and the Chow dome. The Project is located at the
McDonald Observatory at Fort Davis, TX
Category: Concrete Contractor
Completion: Decmber 2011
Owner: University of Texas at Austin
General Contractor: Warden Construction
Carlson & Elliot Dr. Pump Station
Construction of a 10’-6” x 13’-6” generator pad 14 thick, reinforced with a double foundation mat
made of #6 rebar at 12 inches of center., including the construction of 20-ft rock-wall. Along with
a construction of 50-ft wrought iron fence and gates, including the fabrication galvanized steel
trash rack and other miscellaneous modification structural modifications to pump house to furnish
and install a new access gate to service the new water pumps
Category: Commercial Construction
Completion Date: September 2015
Owner: El Paso Water Utilities
Location: Carlson Elloit Wy, El Paso, TX 79915
Engineer: M&M Structural
Bus Stop Enhancement Citywide
Local Government: Cost $272,582.25 / Consist of Demolition of existing concrete site structures
to accommodate new 40-FT X 20-FT bus pads compliant to ADA standards. The project involves
68 sites scattered around the El Paso, TX Region. This project required coordination between
municipal and TXDOT traffic engineering departments.
Completion Date: April 2014
Owner: Sun Metro - City of EL Paso
Country Club Subdivision
Project Consisted of the construction of 340 linear feet of 8 inch sewer line, and the tap of am
existing 12 inch sewer line. Construction of four manhole structures, constructio on 8 inch and 6
inch water line and the installation meter services to each lot. Subgrade preparation and
construction of a new roadway, consisting of the subgrade preparation, base course layout and
two inches of hot mix (Asphalt , including, concrete header curbs.
Completion Date: May 2014
Owner: Privet - Geroge Dipp
Baines & Morehead Appartments - Site Construction
Keystone is acting as subcontractor to Pavilion construction; work consist of Misc. Site
Improvement to Baines and Morehead Apartment. Include construction of new sidewalks, base
course, asphalt pavement, parking lot sealing, traffic pavement markings, ADA ramps, Trash
enclosures, installation of misc. equipment, brick mortar joint repair, and other Misc. items.
Construction contract: $222,680.00
Category: Commercial Construction
Completion Date: Under Construction
Owner: EL Paso Housing Authority - RAD Project
General Contractor: Pavilion Construction
Herbert Apartments - Quadruplex
Construction of Multifamily project to include the construction of two quadruplex residential units,
to include site development and connecting to existing utilities lines.
Owner: Financed by The City of El Paso Community Development Department
Construction Contract: $ 818,000.00.
Category: Multi-Residential Construction
Completion Date: March 09, 2017
Delta Divine Subdivision Development - Multi-Family
New subdivision development, consisting of the construction of 395 linear feet rock wall,
installation of 8 inch ductile iron sewer, 260 linear feet of new 8-inch sewer line and tap to an
existing 12-inch active sewer line, installation of 8-inch water line, Construction of four manhole
structures, including meter services to four subdivided lots. Construction of 360 LF roadway, 6-
inch base course, a 2-inch-thick hot asphalt road, and concrete curbs, sidewalks. As part of the
development, four residential units were constructed, each building slab was monolithically poor
with the reinforced concrete foundation. Each concrete slab was pour with an approximately
80CY of 3000-PSI concrete.
Owner: Project Vida Community Development
Category: Multi-Residential development
Completion Date: September 2017
Pico Norte Lift Station Fence
Construction of Security Fence for the Pico Norte Pump House, construction of 400 linear ft of a
6-ft high security rockwall fence, including on site cast concrete columns, cast in place concrete
cap, 20-in ornamental wrought iron fencing, 6-inch concrete apron, 28-ft double rolling gate,
including other misc. items.
Construction contract: $125,760.00
Owner: El Paso Water Utilities PSB
Category: Commercial Construction
Completion Date: November 11, 2017
SITEWORK
Herbert Appartments - Quadruplex
Construction of Multifamily project to include the construction of two quadruplex residential units,
to include site development and connecting to existing utilities lines.
Owner: Financed by The City of El Paso Community Development Department
Construction Contract: $ 818,000.00.
Category: Multi-Residential Construction
Completion Date: March 09, 2017
Pico Norte Lift Station Fence
Keystone is acting as subcontractor to Pavilion construction; work consist of Misc. Site
Improvement to Baines and Morehead Apartment. Include construction of new sidewalks, base
course, asphalt pavement, parking lot sealing, traffic pavement markings, ADA ramps, Trash
enclosures, installation of misc. equipment, brick mortar joint repair, and other Misc. items.
Owner: EL Paso Housing Authority - RAD Project
Construction contract: $222,680.00
General Contractor: Pavilion Construction
Completion Date: Under Construction
Delta Divine Subdivision Development - Multi-Family
New subdivision development, consisting of the construction of 395 linear feet rock wall,
installation of 8 inch ductile iron sewer, 260 linear feet of new 8-inch sewer line and tap to an
existing 12-inch active sewer line, installation of 8-inch water line, Construction of four manhole
structures, including meter services to four subdivided lots. Construction of 360 LF roadway, 6-
inch base course, a 2-inch-thick hot asphalt road, and concrete curbs, sidewalks. As part of the
development, four residential units were constructed, each building slab was monolithically poor
with the reinforced concrete foundation. Each concrete slab was pour with an approximately
80CY of 3000-PSI concrete.
Owner: Project Vida Community Development
Category: Multi-Residential development
Completion Date: September 2017
801 Mississippi Home Remodel - Design Build
Consist of the remodeling an existing 1600-sf structure and a 600-sf addition. This project
included the demolition of most of the interior partition and the raising of the flat ceiling at the
living room and dining room form 8-ft to 14-ft, while protecting the integrity of the existing roof
structure. Framing of new partition walls and roof for the new addition. New floor and wall
finishes, upgrade of all plumbing, electrical and mechanical systems. Including the exterior
upgrades, which include painting, new concrete driveway and new roofing at the addition are.
Owner: Dr. Cyntiha Beamer
Design Build: Project Designed and constructed by Keystone
Completion Date: July 2016
11453 Lindenwood- New Residence - Design Build
Construction of new 2700-SF Single Family Residence. Consisting of an open concept
multifamily room, dining room, and Kitchen. Two guest bedrooms, master bedroom with all
amenities of a walking closet, dressing room and bathroom, and office space, workout room and
a double garage room. constructed over a turn-down slab on grade foundation on a wood frame,
stucco structure and shingle roof.
Owner: Fernandez Family
Design Build: Project Designed and constructed by Keystone
Completion Date: Dec 2015
Concrete Slab at Pole Barn, Presidio, TX
Projected Completion: Nov, 2011
Owner: Big Bend State Park
General Contractor: WestMix
Contact: Robert Meredith, (432) 295-2666
Amount/Description: $17,100.00 / Construction of 5,500-sf concrete slab with 3000-psi concrete
reinforced with #4 rebar and installation of 12-in PVC storm drain pipe and concrete inlet.
RESIDENTIAL
Addition/Renovation of Shop Building, Terlingua Maintenance Facility
Renovation of the existing shop building converting it into an administrative space and the
construction of a new shop/maintenance building and miscellaneous site improvements.
Owner: Texas Department of Transportation
Contact: Carlos Mendoza (432)371-2280
Architect/Engineer: Morales & Associates, Architects, Inc.
Subcontract Amount: $215,000.
Completion: 2010
Southwest Neuroscience
Remodel approximately 4,000 SF of existing Facility to include the reconfiguration of exam
rooms, reception area, hallways, conference room, EEG room, medical supply room and support
areas.
Owner: Dr. Miguel A. Moreno
Architect: CEDANS Architects
Category: Medical
Completion Date: July 2012
Mission Trails Chapel Ligthing Upgrades
Project Consisted of the remodeling of the existing Chapel at North loop Building for the LDS
Church, including foyer area, Patching and painting of walls and ceilings. All works was
performed during week days and the chapel area was reestablish at the end of each week to LDS
members use.
Owner: FM Group ( LDS Church)
Completion Date: March, 2014
Bus Stop Enhancement Citywide
Consist of Demolition of existing concrete site structures to accommodate new 40-FT X 20-FT bus
pads compliant to ADA standards. The project involves 68 sites scattered around the El Paso, TX
Region. This project required coordination between municipal and TXDOT traffic engineering
departments.
Cost: $272,582.25
Owner: Sun Metro - City of EL Paso
Completion Date: April 2014
Mediwaste Facility - Design Build
Tenant improvement of an existing Metal building, which currently houses medical waste
treatment facility. The project consists reconfiguration of the rehabilitating of 17,510 SF of a
warehouse facility, to accommodate a 1700-SF of new office space and upgrading and existing
240 volt electrical system to a 480 volt system. Upgrading of the existing sewer pipe to black cast
iron pipe and a 1000 gal concrete cooling box, installation of 6 inch water line to service new
office, equipment and a new fire suppression system. Construction of new concrete pits and
foundation pads to house new compactor, boiler and autoclave unit.
Construction Contract: $450,000.
Completion Date: June 2014
Owner: Mediwaste Facility - Anthony Lich
Design Build: Project Designed and constructed by Keystone
Carlson & Elliot Dr. Pump Station
Construction of a 10’-6” x 13’-6” generator pad 14 thick, reinforced with a double foundation mat
made of #6 rebar at 12 inches of center., including the construction of 20-ft rock-wall. Along with
a construction of 50-ft wrought iron fence and gates, including the fabrication galvanized steel
trash rack and other miscellaneous modification structural modifications to pump house to furnish
and install a new access
gate to service the new water pumps
Owner: El Paso Water Utilities
Category: Commercial Construction
Engineer: M&M Structural
Completion Date: September 2015
Delta Divine Subdivision Development - Multi-Family
New subdivision development, consisting of the construction of 395 linear feet rock wall,
installation of 8 inch ductile iron sewer, 260 linear feet of new 8-inch sewer line and tap to an
existing 12-inch active sewer line, installation of 8-inch water line, Construction of four manhole
structures, including meter services to four subdivided lots. Construction of 360 LF roadway, 6-
inch base course, a 2-inch-thick hot asphalt road, and concrete curbs, sidewalks. As part of the
development, four residential units were constructed, each building slab was monolithically poor
with the reinforced concrete foundation. Each concrete slab was pour with an approximately
80CY of 3000-PSI concrete.
Owner: Project Vida Community Development
Category: Multi-Residential development
Completion Date: September 2017
Herbert Appartments - Quadruplex
Construction of Multifamily project to include the construction of two quadruplex residential units,
to include site development and connecting to existing utilities lines.
Owner: Financed by The City of El Paso Community Development Department
Construction Contract: $ 818,000.00.
Category: Multi-Residential Construction
Completion Date: March 09, 2017
Crack seal Rd 237 - White Sands
Crack Sealing of 5 milies of Road 237 to include the Re-Routing exiting carcks to allow sealant to
penetrate, installation of thermoplastic highway stripping,
Construction Contract: $ 124,000.00.
Owner: White Sands Missile Range
Category: Road Construction
Completion Date: July 11, 2017
Pico Norte Lift Station Fence
Construction of Security Fence for the Pico Norte Pump House, construction of 400 linear ft of a
6-ft high security rockwall fence, including on site cast concrete columns, cast in place concrete
cap, 20-in ornamental wrought iron fencing, 6-inch concrete apron, 28-ft double rolling gate,
including other misc. items.
Construction contract: $125,760.00
Owner: El Paso Water Utilities PSB
Category: Commercial Construction
Completion Date: November 11, 2017
COMMERCIAL